| 1 |
Cedar Master Shakes (Handsplit or Tapersawn Shakes) |
Be sure that the roof structure is properly prepared Rafters spacing must be 100 cm apart (at most) Purlins or Battens (wooden or steel) spacing must be 40.60 cm apart Eaveboard should be installed befare Cedar installation
Be sure that the roof structure is properly prepared Rafters spacing must be 100 cm apart (at most) Purlins or Battens (wooden or steel) spacing must be 40.60 cm apart Eaveboard should be installed befare Cedar installation
| 3 |
Soffit Exposed Installation for Cedar Master Shakes |
Be sure that the roof structure is properly prepared Rafters spacing must be 100 cm apart (at most) Purlins or Battens must be wooden with 19 cm spacing for 24" Shakes or 12.5 cm for 18" Shingles Eaveboard should be installed before Cedar installation
 |
3.1 Interlay paper felt with Cedar Shakes or Shingles course by course To avoid direct attack of sunlight to Paper Felt, do not expose paper felt in the Keyway of Cedar |
 |
3.2 No exposed Paper Felt in the keyways

|
 |
3.3 Aesthetic installation both outside and Inside (underneath)
|
 |
|

 |
3.5 Completed Cedar Master - Soffit Exposed Roof
|
|